A selection of completed projects across Serbia — cinemas, offices, cafes, and commercial spaces.
Full dry construction and soundproofing fit-out for the Cineplexx multiplex cinema at Beo Shopping Centre. Works included multi-layer acoustic partition walls, suspended ceilings, mineral wool insulation, and high-spec surface finishing across all cinema halls.
Large-scale cinema fit-out at Galerija Shopping Centre — one of our biggest deployments with 20 installers on site simultaneously. Approximately 80% of all cinema dry construction and finishing works, including acoustic walls, ceilings, insulation, and decorative surfaces.
Complete interior fit-out of two full floors for Bosch at Airport City Business Park. Works covered all dry construction phases: metal framing, plasterboard systems, suspended ceilings, plaster finishing, and painting across open-plan and partitioned office areas.
Fit-out of the 7th and 8th floors for HTEC Group's Belgrade office on Milutina Milankovića. A high-spec office interior delivered with 16 workers on site, covering all dry construction, suspended ceilings, detailed plaster finishing, and painting.
Interior fit-out for Sidek business premises including plasterboard partitions, surface finishing, and high-quality decorative painting works including Oikos Travertino Romano decorative plaster-paint system.
Complete interior fit-out and renovation of Soljica Caffe. Works included all dry construction, decorative plaster, painted surfaces, and bespoke interior finishing throughout the premises.
3 floors of dry construction and interior finishing within Belgrade Waterfront residential development.
Via: OpremingFull interior fit-out for Sole 64 — plasterboard, plaster, and surface finishing works.
Via: OpremingAll adaptation phases — dry construction and finishing across multiple floors for the national power grid operator.
Via: JadranFull building adaptation works — plasterboard, ceilings, plaster, and painting across the entire facility.
Via: JadranComplete renovation and fit-out of the entire 13th floor — all dry construction and finishing phases.
Via: Pravi Ugao